Contact Us
Mobile:18032796331
Mobile:13739612731
Email:3916927@qq.com
Building 2, Area C, Fangyi Technology Park, High-tech Zone, Shijiazhuang City, Hebei Province
40/60KW Integrated Single-Gun DC Charging Pile
- Product Description
-
Technical Parameters
Power Rating
40KW
60KW
Input Voltage
304 - 465VAC
304 - 465VAC
Input Frequency
45 - 65HZ
45 - 65HZ
Output Voltage
50 - 1000V DC
50 - 1000V DC
Output Power
40KW
60KW
Maximum Current
DC80A
DC125A
Cable Length
5M
5M
System Efficiency
≥96%
≥96%
Protection Level
IP54
IP54
Power Factor
≥0.99
≥0.99
Standards
CCS1, CCS2, GB/T, CHAdeMo
Auxiliary Power
12V
12V
Starting Method
Scan QR code, VIN, Password Charging
Scan QR code, VIN, Password Charging
Communication Interface
4G, Ethernet
4G, Ethernet
Cooling Method
Fan Cooling
Fan Cooling
Operating Temperature
-30℃ - 55℃
-30℃ - 55℃
Relative Humidity
5% - 95% Non-condensing
5% - 95% Non-condensing
Operating Altitude
≤2000m
≤2000m
Protection Functions
Overvoltage, Undervoltage, Overload Protection, Short Circuit Protection, Grounding Protection, Surge Protection, Leakage Protection
Overall Dimensions
W×D×H 500×300×500mm
W×D×H 500×300×500mm
Charging Pile Installation Process
Concrete grade not less than C20, underground part height not less than 400mm, above ground part height not less than 200mm, concrete foundation size length*width 300*200mm, appearance complete, flat, without cracks.
Cable Installation
Charging Pile Power
Recommended Cable (Copper) Model mm²
Recommended Cable (Aluminum) Model mm²
40kW Single-gun Integrated Pile
YJV-3*25+2*16
YJV-3*35+2*16
60kW Single-gun Integrated Pile
YJV-3*50+2*35
YJV-3*70+2*35
>> The AC input line wiring starts from the user's distribution switch and is connected to the switch output terminal just before power-on.
>> The distribution point should have overcurrent, short circuit, and lightning protection devices.
>> The AC power line colors yellow, green, red, and light blue correspond to AC phases A, B, C, and neutral line respectively.
>> If the power line has only one color, wire number labels (or marked sleeves) must be attached.
>> AC power lines should be laid separately from DC lines.
>> Power lines must not have broken ends, damage, or scratches.
>> The wiring order is generally protective ground first, then neutral line, and finally AC phase lines.
>> Before electrical connection, ensure all switches, fuses, etc., are in the off position.
Integrated Photovoltaic Storage and Charging Solution

Case Studies
Packaged Shipping
TAG:
Message
Contact
+8615031966899













