240KW Integrated Four-Gun DC Charging Pile
- Product Description
-
Technical Parameters
Power Rating
240KW
Input Voltage
260 - 530VAC
Input Frequency
45 - 65HZ
Output Voltage
50 - 1000VDC
Output Power
240KW
Maximum Current
DC250A+DC250A
Cable Length
5M
System Efficiency
≥96%
Protection Level
IP54
Power Factor
≥0.99
Standards
CCS1, CCS2, GB/T, CHAdeMo
Auxiliary Power
12V, 24V (Optional)
Start Method
Scan QR code, VIN, Password Charging
Communication Interface
4G, Ethernet
Cooling Method
Fan Cooling
Operating Temperature
-30℃~55℃
Relative Humidity
5%~95% Non-condensing
Operating Altitude
≤2000m
Protection Functions
Overvoltage, Undervoltage, Overload Protection, Short Circuit Protection, Grounding Protection, Surge Protection, Leakage Protection
Overall Dimensions
W×D×H 800×630×1800mm
Charging Pile Installation Process
>>Concrete grade not less than C20, underground part height not less than 400mm, above ground part height not less than 200mm, concrete foundation size length*width 800*700mm, appearance complete, flat, without cracks. See the outline below:

Cable Installation
Charging Pile Power
Recommended Cable (Copper) Model mm²
Recommended Cable (Aluminum) Model mm²
240kW Dual-gun Integrated Pile
Two YJV-3*95+2*50 cables
Two YJV-3*150+2*95 cables
>>AC input line wiring starts from the user's distribution switch, connected to the switch output terminal just before power-on.
>The distribution point should have overcurrent, short circuit, and lightning protection devices.
>>AC power line colors yellow, green, red, light blue correspond to AC phases A, B, C and neutral line respectively.
>>If the power line has only one color, line number labels (or marked sleeves) must be attached.
>>AC power lines should be laid separately from DC lines.
>>Power lines must not have broken ends, damage, or scratches.
>>Wiring order is generally protective earth first, then neutral, and finally AC phase lines.
>>Before electrical connection, ensure all switches, fuses, etc. are in the off position.