Contact Us
Mobile:18032796331
Mobile:13739612731
Email:3916927@qq.com
Building 2, Area C, Fangyi Technology Park, High-tech Zone, Shijiazhuang City, Hebei Province
120/160KW Integrated Dual-Gun DC Charging Pile
- Product Description
-
Technical Parameters
Power Rating
120KW
160KW
Input Voltage
304 - 456VAC
304 - 456VAC
Input Frequency
45 - 55HZ
45 - 65HZ
Output Voltage
50 - 1000VDC
50 - 1000VDC
Output Power
120KW
160KW
Maximum Current
DC250A+DC250A
DC250A+DC250A
Cable Length
5M
5M
System Efficiency
≥96%
≥96%
Protection Level
IP54
IP54
Power Factor
≥0.99
≥0.99
Standards
CCS1, CCS2, GB/T, CHAdeMo
Auxiliary Power
12V
12V
Start-up Method
Scan QR code, VIN, Password Charging
Scan QR code, VIN, Password Charging
Communication Interface
4G, Ethernet
4G
Cooling Method
Fan Cooling
Fan Cooling
Operating Temperature
-30℃ - 55℃
-30℃ - 55℃
Relative Humidity
5% - 95% Non-condensing
5% - 95% Non-condensing
Operating Altitude
≤2000m
≤2000m
Protection Functions
Overvoltage, Undervoltage, Overload Protection, Short Circuit Protection, Grounding Protection, Surge Protection, Leakage Protection
Overall Dimensions
W×D×H 700×400×1700mm
W×D×H 750×500×1700mm
Charging Pile Installation Process
>> Concrete grade not less than C20, underground part height not less than 400mm, above ground part height not less than 200mm, concrete foundation size length*width 900*600mm, appearance complete, flat, without cracks. See the outline as follows:

Cable Installation
Charging Pile Power
Recommended Cable (Copper) Model mm2
Recommended Cable (Aluminum) Model mm2
120kW Dual-gun Integrated Pile
YJV-3*95+2*50
YJV-3*120+2*70
160kW Dual-gun Integrated Pile
YJV-3*120+2*70
YJV-3*185+2*95
>> AC input line wiring starts from the user's distribution switch, connected to the switch output terminal just before power-on.
>> The distribution area should have overcurrent, short circuit, and lightning protection devices.
>> AC power line colors yellow, green, red, light blue correspond to AC phases A, B, C and neutral line respectively.
>> If the power line has only one color, wire number labels (or marked sleeves) must be attached.
>> AC power lines should be laid separately from DC lines.
>> Power lines must not have broken ends, damage, or scratches.
>> Wiring order is generally protective ground first, then neutral, and finally AC phase lines.
>> Before electrical connection, ensure all switches, fuses, etc. are in the off position.
Integrated Photovoltaic Storage and Charging Solution

Case Studies
Packaged Shipping
TAG:
Message
Contact
+8615031966899













